GCSB-GDL-DPP-001 Data Protection and Privacy Playbook
Document type: Guideline (advisory playbook) Parent procedure: GCSB-PRC-DPP-001 Data Protection and Privacy Procedure Parent standard: GCSB-ST-CSF-DPP-001 Data Protection and Privacy Standard, Version 2.0 Version: 1.0 Status: Issued Approved by: GCSB Governing Council, 19 October 2026 Effective: 19 October 2026 Next review: 19 October 2027 Prepared by: Global Converged Security Board (GCSB)
This playbook is advisory. It explains how to apply GCSB-PRC-DPP-001 in practice. Where this playbook and the parent standard or procedure differ, the standard and procedure prevail. This playbook is not legal advice; where law and this playbook interact, take advice from a qualified professional.
1. Purpose
The Data Protection and Privacy standard requires classification, handling, retention, protection and lawful processing of information - including personal data - across the converged estate. The parent procedure fixes the mandatory sequence and cycles. This playbook shows how to run data protection as a daily operational discipline, with step-by-step guidance, worked examples, checklists and the records to keep.
The worked examples use the fictional Meridian Logistics Ltd (120 staff, head office, two warehouses, fleet operation).
2. Guiding principles
- You cannot protect what you have not found. Data discovery precedes classification; classification precedes handling rules.
- Classification drives behaviour. A label that does not change how people store, share or destroy data is decoration.
- Privacy is a design property. Lawful basis, minimisation and retention are decided when a process is designed, not after a complaint.
- Converged data is still data. CCTV footage, access-control logs and visitor records are personal data and live under the same rules as databases.
4. Scope and roles
This playbook applies to every organisation adopting GCSB-ST-CSF-DPP-001 through GCSB-PRC-DPP-001. It is advisory throughout: where it differs from the parent standard or procedure, the standard and procedure prevail.
| Role | Part in this playbook |
|---|---|
| Controller | Decides purposes and means; approves DPIAs |
| Processor | Processes only on documented instructions |
| DPO | Independent advice and monitoring |
| CCSO | Coordinates security controls with the privacy programme |
5. Traceability
| Play | Procedure step(s) | Binding clocks |
|---|---|---|
| Play 1 | Step 1-2 | - |
| Play 2 | Step 2-4 | - |
| Play 3 | Step 5-7 | - |
| Play 4 | Step 7-9 | - |
| Play 5 | Step 10-13 | Gap assessments at months 6 and 12 |
Play 1 - Discover and inventory data (Procedure Steps 1-2)
Objective
Build the record of what data the organisation holds, where, and why.
Step by step
- List the business processes (sales, operations, HR, finance, security operations).
- For each process, record: what data it uses, where it lives, who can access it, why it is needed.
- Explicitly sweep the converged sources: CCTV, access logs, visitor books, vehicle/ANPR records, incident reports, body-worn video. These are routinely forgotten and routinely personal data.
- For each personal-data processing activity, record the lawful basis. "We might need it" is not a basis.
- Record the retention period per data type.
- Consolidate into the data inventory; name its owner and review date.
Worked example - Meridian Logistics
Meridian's inventory covers 9 processes and 34 data types. The converged sweep finds: CCTV at both warehouses (footage kept indefinitely - no retention set), door-access logs (kept indefinitely), a paper visitor book at head office (pages never removed), and driver telematics including location history (no documented basis). Lawful bases are recorded per activity: employee data under contract and legal obligation, as applicable; customer data under contract; CCTV under legitimate interest with a documented balancing note. The inventory is owned by the office manager, reviewed annually.
Checklist
- Process-based inventory completed
- Converged/physical sources swept and included
- Lawful basis recorded per personal-data processing activity
- Retention period recorded per data type
- Inventory owner and review date set
Records to keep
- The data inventory, dated
- Lawful-basis notes (including legitimate-interest balancing notes)
- The converged-source sweep notes
Common pitfalls
- System-only inventories. Listing databases misses the spreadsheets, email archives and camera footage where data actually accumulates.
- Copy-paste lawful bases. "Legitimate interest" applied to everything, without the balancing test, is a finding waiting to happen.
Measures of success
The organisation can answer, for any data type: where it is, why it is held, on what basis, and for how long.
Play 2 - Classify and label (Procedure Steps 2-4)
Objective
Apply the standard's classification scheme so handling rules can attach to data.
Step by step
- Adopt a small scheme: three or four levels (e.g. Public / Internal / Confidential / Restricted) with one-line definitions and examples per level.
- Classify at the container level where possible (this folder, this system, this cabinet) - people classify containers reliably, documents not.
- Individually classify the high-value data sets (customer database, HR records, CCTV).
- Attach a handling table to each level: storage, sharing, transmission, disposal. One page, printed, distributed.
- Brief all staff; record the briefing.
Worked example - Meridian Logistics
Meridian adopts four levels. Examples agreed: Public - website content; Internal - rosters, process documents; Confidential - customer contracts, telematics history; Restricted - HR records, payroll, incident investigations. Containers classified: the HR system and the HR shared drive are Restricted; the operations drive is Internal; the customer database is Confidential. The one-page handling table says, among other things: Restricted is never emailed externally; Confidential leaves the building only encrypted; CCTV footage is Confidential and exported only by the CCSO. Briefing delivered at the June all-hands; attendance recorded.
Checklist
- Classification scheme adopted with examples
- Containers classified; high-value sets individually classified
- Handling table per level published (one page)
- Staff briefed; briefing recorded
- Sample check: sampled data correctly classified
Records to keep
- The classification scheme and handling table
- The container classification list
- Briefing records (date, attendance, material version)
Common pitfalls
- Over-classification. If everything is Confidential, nothing is. Challenge over-classification in review, but never impose a fixed quota; classify by actual sensitivity.
- Labels without teeth. If Confidential data can still be emailed anywhere, the scheme is cosmetic.
Measures of success
Sampled data is correctly classified; staff can state the handling rules for each level.
Play 3 - Apply protection controls (Procedure Steps 5-7)
Objective
Implement the technical and physical controls the standard requires for each classification level.
Step by step
- Map controls to levels: encryption at rest for Confidential and above; encryption in transit for anything leaving the organisation's control; access via IAM roles per level; physical storage and destruction rules for paper and media.
- Verify encryption system by system - "the vendor says it's encrypted" is not verification.
- Wire classification levels into IAM: Restricted data reachable only by named roles, recertified on the IAM cycle.
- Apply the rules to converged systems: CCTV and access logs get retention limits, access logging and a named owner, exactly like a database.
- Register exceptions for systems that cannot meet the controls, with compensating measures.
Worked example - Meridian Logistics
Verification finds the customer database and HR system encrypted at rest; the file store encrypted after a configuration change; laptops encrypted via a device-management rollout completed in August (11 laptops done, evidence: management console report filed). The CCTV recorders cannot encrypt storage - registered as an exception with compensating measures (recorders in locked cabinets, network-segmented per the TIA playbook, 90-day retention). CCTV access is restricted to the CCSO and facilities supervisor, with an export log started.
Checklist
- Control map per classification level defined
- Encryption verified system by system, evidence filed
- Classification levels wired into IAM roles
- Converged systems under retention and access rules with named owners
- Exceptions registered with compensating measures
Records to keep
- The control map
- Encryption verification evidence per system
- IAM role mapping
- Exception register entries
- CCTV/log export logs
Common pitfalls
- Encryption assumed, not verified. Check each system.
- Forgotten paper. Organisations secure the database and leave the printed payroll report on a desk.
Measures of success
Controls per level are verified operating, including for physical and converged data.
Play 4 - Retention, disposal and rights handling (Procedure Steps 7-9)
Objective
Operate retention schedules, secure disposal, and responses to individuals exercising their rights.
Step by step
- Publish the retention schedule: per data type, the period, the trigger (e.g. "6 years from end of employment"), and the disposal method.
- Automate disposal where possible; where manual, run a diarised disposal cycle with a recorded log or certificate.
- Define the rights-request process: who receives requests, the identity-check step, the response clock per applicable law, the record kept.
- Rehearse the rights process once with a fictional request - the first real request should not be the first test.
- Include converged data in rights responses: a subject access request can cover CCTV footage and access logs.
Worked example - Meridian Logistics
Meridian's schedule sets: CCTV 90 days (auto-deletion configured after the recorder replacement); door logs 12 months; visitor book pages removed monthly and shredded; employee files 6 years after employment ends; telematics history 13 months. The first disposal run in September destroys 14 boxes of legacy paper with a certificate filed. The rights process is rehearsed in October: a fictional driver requests "everything you hold on me"; the team produces HR file, telematics extracts, door logs and CCTV search within the clock, and records the rehearsal. Two real requests arrive the following spring and are answered in 9 and 12 days.
Checklist
- Retention schedule published and operating
- Disposal cycles diarised and run, with logs/certificates
- Rights-request process defined with identity check and clock
- Process rehearsed once with a fictional request
- Converged data included in rights responses
Records to keep
- The retention schedule
- Disposal logs and destruction certificates
- Rights-request log (request, identity check, response, dates)
- The rehearsal record
Common pitfalls
- Retention without disposal. Schedules that say when data may go but no process that actually deletes it.
- Clock surprise. Rights requests carry legal deadlines. Know yours before one arrives.
Measures of success
Disposal happens on schedule with records; a rehearsal rights request is answered within the clock.
Play 5 - Incidents, review and evidence (Procedure Steps 10-13)
Objective
Handle data breaches per the standard and the IRBC procedure, and keep the data-protection programme under review.
Step by step
- Define what counts as a personal-data breach, who decides, and the notification clocks that apply; link directly to the incident response playbook.
- Keep a breach register, including near-misses and breaches not requiring notification, with the reasoning recorded.
- Decide the decision route in advance - the middle of a breach is the wrong time to design governance.
- Review the programme annually: inventory currency, classification health, disposal records, rights performance, breach history.
- Keep the evidence pack: inventory, schedule, disposal logs, rights records, breach register, review minutes.
Worked example - Meridian Logistics
In November, a misaddressed email sends one customer's delivery schedule to another customer. The CCSO classifies it as a minor breach: contained (recipient confirmed deletion), low harm, no notification required - reasoning recorded in the breach register. The near-miss section records a printed route sheet found in a cab; the fix is a cab-clear-out rule added to driver training. The annual review in February finds disposal running on schedule, classification healthy, and one action: extend the retention schedule to the new customer portal's data.
Checklist
- Breach definition, decision route and clocks documented
- Breach register maintained with reasoning, including near-misses
- Annual programme review completed and minuted
- Evidence pack complete and retrievable
Records to keep
- Breach register with reasoning per entry
- Annual review report and minutes
- The full data-protection evidence pack
Common pitfalls
- Notification paralysis. Decide the decision route in advance.
Measures of success
Breaches are handled within the clocks; the annual review demonstrably improves the programme.
4. Quick reference
| Cycle | Activity |
|---|---|
| Per event | Rights requests within legal clocks; breaches per IRBC |
| Diarised cycle | Disposal runs per the retention schedule |
| Annually | Data-protection programme review; inventory refresh |
| Per adoption | Discovery, classification and controls within the procedure's clocks |
5. Related documents
- GCSB-ST-CSF-DPP-001 Data Protection and Privacy Standard, v2.0 (parent standard, sole normative source)
- GCSB-PRC-DPP-001 Data Protection and Privacy Procedure (parent procedure)
- GCSB-ST-CSF-IRBC-001 (breach response) and GCSB-ST-CSF-IAM-001 (access to data)
Version 1.0 - issued 19 October 2026. Copyright Global Converged Security Board.